vault backup: 2026-04-29 13:04:49
This commit is contained in:
parent
95febf61b6
commit
0d944f642d
2 changed files with 9 additions and 1 deletions
|
|
@ -10,7 +10,7 @@ server: optical-web-1
|
|||
tags: [oliver, video, accessibility, ai, captions, audio-description, tts, celery, mongodb]
|
||||
created: 2026-04-14
|
||||
last_commit: 2026-04-29
|
||||
commits: 234
|
||||
commits: 235
|
||||
---
|
||||
|
||||
## Overview
|
||||
|
|
@ -83,6 +83,10 @@ Pipeline phases:
|
|||
| 2026-03-03 | Add download assets panel + VTT file upload to QC review |
|
||||
|
||||
## Sessions
|
||||
### 2026-04-29 – Review local dictionary table integration for
|
||||
**Asked:** Review local dictionary table integration for the FRAZE program before API integration.
|
||||
**Done:** Analyzed glossary structure and prepared backend exception for app/lib/ directory in gitignore.
|
||||
|
||||
### 2026-04-29 – Check which parts of the video
|
||||
**Asked:** Check which parts of the video accessibility tool (version control, user action log, cost tracker) are done and what still needs implementation.
|
||||
**Done:** Reviewed current deployment setup on VPS with Docker Compose; confirmed production runs on optical-web-1, not Cloud Run; identified that cost dashboard link should use cost.oliver.agency instead of the previously provided reference.
|
||||
|
|
@ -266,6 +270,7 @@ Pipeline phases:
|
|||
## Change Log
|
||||
| Date | Requested | Changed | Files |
|
||||
|------|-----------|---------|-------|
|
||||
| 2026-04-29 | Glossary integration | Added app/lib/ exception to gitignore, reviewed translation table structure | .gitignore |
|
||||
| 2026-04-29 | Video accessibility tool | Version control system, user action log, cost tracker implementation status review; removed incorrect cost dashboard reference | Project documentation, deployment configuration |
|
||||
| 2026-04-29 | Language QC system | Added Job.language_qc dict, qc_assignments array, language_qc.py service with assign/reassign/approve/reject/reopen operations | Job model, language_qc.py, database migration |
|
||||
| 2026-04-29 | Video accessibility tool | Version control setup, user action log implementation, cost tracker total and per-user tracking, removed incorrect cost dashboard link | AccessibilityTool.ts, UserActionLog.ts, CostTracker.ts, config.ts |
|
||||
|
|
|
|||
|
|
@ -158,3 +158,6 @@ tags: [daily]
|
|||
- 12:58 (<1min) | `semblance`
|
||||
- **Asked:** Check Obsidian integration to ensure all project changes are logged with sufficient detail for user understanding.
|
||||
- **Done:** Verified that the cloud-code script receives complete project context from HUCOM on startup including server and deployment information.
|
||||
- 13:03 | `video-accessibility`
|
||||
- **Asked:** Review local dictionary table integration for the FRAZE program before API integration.
|
||||
- **Done:** Analyzed glossary structure and prepared backend exception for app/lib/ directory in gitignore.
|
||||
|
|
|
|||
Loading…
Add table
Reference in a new issue