diff --git a/01 Projects/video-accessibility/Video Accessibility Platform.md b/01 Projects/video-accessibility/Video Accessibility Platform.md index a11bc50..14f7e7e 100644 --- a/01 Projects/video-accessibility/Video Accessibility Platform.md +++ b/01 Projects/video-accessibility/Video Accessibility Platform.md @@ -10,7 +10,7 @@ server: optical-web-1 tags: [oliver, video, accessibility, ai, captions, audio-description, tts, celery, mongodb] created: 2026-04-14 last_commit: 2026-04-29 -commits: 234 +commits: 235 --- ## Overview @@ -83,6 +83,10 @@ Pipeline phases: | 2026-03-03 | Add download assets panel + VTT file upload to QC review | ## Sessions +### 2026-04-29 – Review local dictionary table integration for +**Asked:** Review local dictionary table integration for the FRAZE program before API integration. +**Done:** Analyzed glossary structure and prepared backend exception for app/lib/ directory in gitignore. + ### 2026-04-29 – Check which parts of the video **Asked:** Check which parts of the video accessibility tool (version control, user action log, cost tracker) are done and what still needs implementation. **Done:** Reviewed current deployment setup on VPS with Docker Compose; confirmed production runs on optical-web-1, not Cloud Run; identified that cost dashboard link should use cost.oliver.agency instead of the previously provided reference. @@ -266,6 +270,7 @@ Pipeline phases: ## Change Log | Date | Requested | Changed | Files | |------|-----------|---------|-------| +| 2026-04-29 | Glossary integration | Added app/lib/ exception to gitignore, reviewed translation table structure | .gitignore | | 2026-04-29 | Video accessibility tool | Version control system, user action log, cost tracker implementation status review; removed incorrect cost dashboard reference | Project documentation, deployment configuration | | 2026-04-29 | Language QC system | Added Job.language_qc dict, qc_assignments array, language_qc.py service with assign/reassign/approve/reject/reopen operations | Job model, language_qc.py, database migration | | 2026-04-29 | Video accessibility tool | Version control setup, user action log implementation, cost tracker total and per-user tracking, removed incorrect cost dashboard link | AccessibilityTool.ts, UserActionLog.ts, CostTracker.ts, config.ts | diff --git a/99 Daily/2026-04-29.md b/99 Daily/2026-04-29.md index 8af970c..62ba178 100644 --- a/99 Daily/2026-04-29.md +++ b/99 Daily/2026-04-29.md @@ -158,3 +158,6 @@ tags: [daily] - 12:58 (<1min) | `semblance` - **Asked:** Check Obsidian integration to ensure all project changes are logged with sufficient detail for user understanding. - **Done:** Verified that the cloud-code script receives complete project context from HUCOM on startup including server and deployment information. +- 13:03 | `video-accessibility` + - **Asked:** Review local dictionary table integration for the FRAZE program before API integration. + - **Done:** Analyzed glossary structure and prepared backend exception for app/lib/ directory in gitignore.