Commit graph

4 commits

Author SHA1 Message Date
Vadym Samoilenko
ff9cdffc32 Phase 5: Fix export, slide edit, static files; add README
- Fix PPTX/PDF export: Puppeteer URL port mismatch (80 → 3000)
- Fix backend export_utils to use NEXT_INTERNAL_URL env var
- Add Chromium to frontend Dockerfile for Docker-based export
- Fix slide edit socket hang up with asyncio.wait_for() timeouts
- Add FastAPI StaticFiles mounts for /static and /app_data
- Add Next.js rewrite for /static/ to proxy to backend
- Show template thumbnail in master decks admin page
- Add error logging to ReviewWorkflow component
- Add Docker env vars for web service (APP_DATA_DIRECTORY, app_data volume)
- Add project README in English

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-27 15:40:36 +00:00
Vadym Samoilenko
69a8829750 Phase 3: Bug fixes, feature enhancements, and polish
P0 Critical: presentation isolation (client scoping), storage super_admin fix,
template selection in worker, IMAGE_PROVIDERS list fix.

P1 High: template layout management UI (delete/filter/bulk), slide-based parsing
mode, LLM model listing & connection test, settings persistence to DB (Fernet
encryption), logout button.

P2 Polish: storage improvements (master deck files, per-client breakdown, bulk
delete, hard purge, client selector), image generation error visibility
(__image_error__ badge), hamster wheel loading animation.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-27 12:58:52 +00:00
Vadym Samoilenko
c97841f6d1 Phase 6: Export & Polish — brand export, client dashboard, retention, analytics
- Brand-enforced export pipeline (PPTX/PDF with auto brand fonts/colors/logo)
- Client library dashboard with two-level navigation (client grid → detail tabs)
- Data retention service with ARQ cron jobs (daily cleanup + weekly purge)
- Brand-adaptive UI theme via CSS custom properties (dynamic per client)
- Analytics dashboard with overview, usage, quality, and performance metrics

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-26 16:41:58 +00:00
Vadym Samoilenko
cf21ba4516 Phase 1-2: Foundation + Admin Panel & Client Management
Phase 1 (Foundation):
- Project restructure (presenton-main → backend/ + frontend/)
- Database schema (8 new models, Alembic config, seed script)
- Auth (Azure AD SSO + dev bypass, JWT sessions, AuthMiddleware)
- RBAC (access_service, rbac_middleware, admin routers)
- Audit logging (fire-and-forget, AuditMiddleware, admin router)
- i18n (react-i18next with 5 namespace files)

Phase 2 (Admin Panel & Client Management):
- Admin panel shell (sidebar layout, role guard, 12 pages)
- Redux admin slice with 18 async thunks
- User management (role changes, deactivation)
- Client management (CRUD, brand config, team management)
- Brand config editor (colors, fonts, logos, voice rules)
- Master deck upload & parser (PPTX → HTML → React pipeline)
- Audit log viewer with filters and CSV/JSON export

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-26 15:37:17 +00:00